A team of subsea engineers at your service
Our services under management or subcontracting.
Design of underwater structures and assistance with the installation of equipment
Our subsea engineers deal with all your technical issues
Structural design
Riser tower, FLET, Flowline, flexible spool connection…
Production tracking
installation of equipment by rov (underwater robot)
Let’s talk about your project
Two ways of working with great flexibility
Regulated
Our subsea engineers are part of your project teams.
In subcontracting
The studies are carried out on our premises with our own means of calculation.
Other sectors of activity
OFFSHORE structures
INCONCEPT brings its skills in the realization of basic and detailed engineering of offshore platforms undergoing hostile environments.
Some references
BP Angola Block 18 / Greater Plutonio
SUBSEA 7
Detailed engineering of an 8 riser tower in 1310m of water
Design of the guiding frame and forgings
Establishment of requisitions, assistance to buyers and monitoring of suppliers
Esso Exploration / Angola Block 15 Gas Gathering Project
SUBSEA 7
Detailed engineering of an SHR (Single Hybrid Riser) in 1010m of water
Design of buoyancy tank, upper and lower riser assemblies
Supervision of manufacturing, transportation, installation and in-place calculations
Total E&P Nigeria Limited / USAN Deepwater Development Project SAIPEM
Assistance with the installation of underwater equipment from 730 to 800m of water Design of structures dedicated to offshore manufacturing and installation of SHR components
Assistance to installation and operations engineers
Husky Oil China / LIWAN 3-1 Deep Water Project
SAIPEM
ENI ANGOLA – BLICK 15/06 – WEST HUB DEVELOPMENTPROJECT
TechnipFMC
Supervision of engineers and draftsmen in the design of support structures for the installation of underwater structures and seafastening during sea transport
Assistance to installation engineers, mobilization and operations during installation campaigns.
TOTAL ANGOLA / KAOMBO PROJECT
TechnipFMC
Design of the connection of flexible spools to the LRA (Lower Riser Assembly) by an assembly of forgings and connectors up to 1925m of water.
The environment is extreme: high pressure, low temperature and vibrations due to flexible spools.